How much time is spent in scanning across each row of pixels during screen refresh on a raster system with a resolution of 1280 by 1024 and refresh rate of 60 frames per second?
4 years ago
Computer Graphics
The time required for scanning one frame is 1/60 = 0.01666
One frame has 1024
The time of scanning on row = 0.01666 / 1024 = 1.627 * 10-5 sec
Bijay Satyal
Oct 22, 2021